Fitness Center Chicago Suburb Oak Brook

Pre-Drill VSCs and VCCs

Ground Improvement – installed pre-drilled vibratory stone columns and vibratory concrete columns

PROJECT OVERVIEW

For this job, we completed ground improvement for a future fitness center in the suburbs of Chicago Illinois. CNC Foundations is an industry leader in ground improvement techniques. We provide design-build services for different general contractors and developers. On this site, we are installed vibratory stone columns and vibratory concrete columns.

REQUIREMENTS AND CHALLENGES

We utilized a bottom feed vibratory stone column method because of the granular soils that were highly collapsible on this site.

Vibratory stone columns can be installed in two different ways.

  • Top Feed – the stone is tipped from the surface.
  • Bottom Feed – the stone travels to the bottom of the flat via displacement pipe and the pile is built from the bottom up on certain parts of this particular site.

On this site, there were granulars that were compacted fairly stiff at the surface. The solution was to pre-bore the upper 10 feet of these particular piles.

SOLUTION AND RESULTS

Also on this jobsite were peat and organic soils. Peats and organics will break down over time, thus causing potential settlement in the future. On this building, we also utilized vibratory concrete columns that created a rigid element through those peat and organic layers that will mitigate any potential concerns for settlement in the future.

Vibratory concrete columns are where concrete is pumped from a ready mistrust or batch plan through a displacement pile from the top of the vibratory fly down to the bottom of the vibratory probe. The concrete is then pumped at the base of the pile and it’s built-in lifts from the bottom of the pile all the way to the surface.

Project Details

CNC Foundations installed pre-drilled vibratory stone columns and vibratory concrete columns for a fitness center in the Chicago suburb of Oak Brook, IL.

Not sure what geotechnical solution can work for your job? We can help.

Related Case Studies

Ball Park Village Phase 2 St Louis MO Vibratory Stone Columns

Ground Improvement

St. Louis Ballpark Village Site – Installing Vibratory Stone Columns

Ballpark Village St. Louis, Clark Avenue, St. Louis, MO, USA

View Case Study

Side overhead view of CNC team pouring concrete

Uplift Anchors

Vibratory Stone Column Uplift Anchor Installation at Western Carolina University

Cullowhee, NC

View Case Study

Controlled Modulus Columns vs. Vibratory Concrete Columns 3

Vibratory Concrete Columns

Pre-Drill VSCs and VCCs Fitness Center Chicago Suburb Oak Brook

OakBrook, IL

View Case Study

Let’s Talk

  • This field is for validation purposes and should be left unchanged.