Turn on screen reader support To enable screen reader support, press Ctrl+Alt+Z To learn about keyboard shortcuts, press Ctrl+slash

Fitness Center Chicago Suburb Oak Brook

Pre-Drill VSCs and VCCs

Utilizing Multiple Ground Improvement Solutions for Fitness Center

PROJECT OVERVIEW

For this job, we completed ground improvement for a future fitness center in the suburbs of Chicago Illinois. CNC Foundations is an industry leader in ground improvement techniques. We provide design-build services for different general contractors and developers. On this site, we are installed vibratory stone columns and vibratory concrete columns.

REQUIREMENTS AND CHALLENGES

We utilized a bottom feed vibratory stone column method because of the granular soils that were highly collapsible on this site.

Vibratory stone columns can be installed in two different ways.

  • Top Feed – the stone is tipped from the surface.
  • Bottom Feed – the stone travels to the bottom of the flat via displacement pipe and the pile is built from the bottom up on certain parts of this particular site.

On this site, there were granulars that were compacted fairly stiff at the surface. The solution was to pre-bore the upper 10 feet of these particular piles.

SOLUTION AND RESULTS

Also on this jobsite were peat and organic soils. Peats and organics will break down over time, thus causing potential settlement in the future. On this building, we also utilized vibratory concrete columns that created a rigid element through those peat and organic layers that will mitigate any potential concerns for settlement in the future.

Vibratory concrete columns are where concrete is pumped from a ready mistrust or batch plan through a displacement pile from the top of the vibratory fly down to the bottom of the vibratory probe. The concrete is then pumped at the base of the pile and it’s built-in lifts from the bottom of the pile all the way to the surface.

Project Details

CNC Foundations installed pre-drilled vibratory stone columns and vibratory concrete columns for a fitness center in the Chicago suburb of Oak Brook, IL.

Not sure what geotechnical solution can work for your job? We can help.

Related Case Studies

Aggregate Piers / VSCs

Chicago, IL | Aggregate Piers / VSCs

CNC Foundations went from the first call to installation in just 3 weeks. We expedited the process for this emergency installation and delivered results.

View Case Study

Aggregate Piers / VSCs

Orland Park, IL | Aggregate Piers / VSCs

A 5 story mixed-use building (parking garage and restaurant) constructed in Orland Park. It will be used for parking and a restaurant.

View Case Study

Vibratory Concrete Columns

East Peoria, IL | Aggregate Piers / VSCs

A 143,000 square foot retail warehouse for a wholesale store was proposed at a large retail center. We installed over 1,700 stone columns.

View Case Study

Let’s Talk

  • By providing my phone number to CNC Foundations, I agree and acknowledge that CNC Foundations may send text messages to my wireless phone number for any purpose. Message and data rates may apply. We will only send one SMS as a reply to you, and you will be able to Opt-out by replying “STOP”. For more information on how your data will be handled please visit our Privacy Policy.