Water Treatment Plant
Learn how CNC Foundations’ turnkey solution allowed a water treatment plant to be up and running less than one month after suffering damaging cracks in a levee floor.
Learn how CNC Foundations’ turnkey solution allowed a water treatment plant to be up and running less than one month after suffering damaging cracks in a levee floor.
A regional water treatment plant recognized that the concrete wall slope in one of their levees was experiencing a failed slope due to a crack in the concrete. Water treatment plants have levees surrounding their large tanks that assist in water containment. A crack in the concrete floor would prevent one of the levees from properly containing the water, exposing the foundation to leaks.
Replacing the concrete wasn’t an option because the slope would continue to fail, and the client would have to cease operations until they fixed the problem. The client reached out to CNC Foundations to provide a permanent solution to provide a permanent solution to resisting future slope failures and to allow for the concrete slope to be repaired so the plant could resume operations quickly.
We used helical piers to provide permanent slope stability because they provide high-capacity capabilities and offer instant tension resistance. Working in conjunction with a concrete contractor, we installed a grid pattern of helical piers in a W formation and tied the pattern into the new concrete for slope stabilization.
Our turnkey solution allowed our internal team to offer a quote in just three days, and we were able to start installation in under one week. We retained the assistance of a concrete contractor and were able to complete the installation of the helical piers in just over two weeks.
CNC Foundation’s turnkey solution kept the process on time and within budget. Because of our rapid response and efficient installation, the plant resumed operations in under one month. Our permanent solution will ensure the levee slope remains stable and will prevent additional cracks from forming on the concrete slope.
CNC Foundations impressed the client with our ability to design and implement a solution so they could return to operating capacity.
SECTOR
Civic & Cultural
LOCATION
Missouri
SERVICE
Helicals
SOLUTION
Bearing Capacity/Settlement Control
APPLICATION
Helical Piles
Competing foundation companies often deal with multiple third-party firms. For example, they may retain an outside engineering firm to produce a project design and then partner with a separate installation franchise to calculate a quote. The participation of outside parties increases the likelihood of project delays, which ultimately leads to decreased productivity and potential loss of revenue.
CNC Foundations utilizes a turnkey solution that keeps design and pricing in-house. We only use third parties to verify our design and confirm our quotes, minimizing the risk of delays and keeping the project on track. When you partner with CNC Foundations, you are dealing with one company and one contract.
Waste Water Treatment Plant
The city of Bowling Green, Kentucky, acquired Federal Stimulus money to construct a new, multi-million dollar Wastewater Treatment Facility to replace the outdated facility.
Millennium on LaSalle
We were contacted about this challenge to design and install a foundation system that would support the retrofit 14-story elevator structure.