Innovative Support System for College

Aggregate piers provide foundation support at Fine and Performing Arts Center at the College of William & Mary

The Problem

CNC Foundations installed aggregate piers at the College of William & Mary in Williamsburg, Va. The soils at the project site consisted of a mixture of clays, sands, and silts with varying strengths.

Our Solution

The aggregate piers and a tower crane pad were installed in both the theatre and music areas of the Fine and Performing Arts Center Phi Beta Kappa Memorial Hall to increase the soil-bearing capacity to 5,000 psf and reduce settlements to less than 1 in. CNC utilized a direct-push method of aggregate pier installation, which not only reduces spoils that must be managed but densifies and reinforces the variable soil profile to ensure the project settlement requirements are achieved. The work was performed in phases, with two separate mobilizations, and near existing site features to meet the project sequence and schedule.

Quality Assurance and Control

The project’s design was confirmed with a full-scale modulus test performed by CNC’s field team. CNC’s VSC installation equipment is outfitted with computer-monitoring systems that are unique in the marketplace. CNC’s proprietary data logger shows the number of piles, the time it took to install the piles, and the bar pressure achieved on every lift.

“Our computer-monitoring system is another method of checks and balances, which allows us to move through the schedule of the project a little quicker,” says CNC President Jason Courtney. “This gives a general contractor and an engineer-of-record peace of mind throughout the project, accelerates schedules and better utilizes dollars.”

Not sure what geotechnical solution can work for your job? We can help.

Related Case Studies

Ground Improvement

St. Louis, MO | Aggregate Piers / VSCs

CNC Foundations completed a project in St. Louis as an addition to Ballpark Village, an entertainment district adjacent to Busch Stadium.

View Case Study

Ground Improvement

Columbus, OH | Vibratory Stone & Concrete Columns

Three new buildings required a 7000 psf bearing pressure. CNC Foundations was selected to install an Aggregate Pier/VSC Ground Improvement.

View Case Study

Ground Improvement

Iowa | Aggregate Piers / VSCs

A new gymnasium addition was constructed on a high school campus. As a result of the soil conditions, ground improvement was required.

View Case Study

Let’s Talk

  • By providing my phone number to CNC Foundations, I agree and acknowledge that CNC Foundations may send text messages to my wireless phone number for any purpose. Message and data rates may apply. We will only send one SMS as a reply to you, and you will be able to Opt-out by replying “STOP”. For more information on how your data will be handled please visit our Privacy Policy.