PROJECT OVERVIEW

The city of Bowling Green, Kentucky, acquired Federal Stimulus money to construct a new, multi-million dollar Wastewater Treatment Facility to replace the outdated facility.

REQUIREMENTS AND CHALLENGES

Due to the many fissures and caves in the area, the Engineer of Record required the facility to be supported and tied down.

SOLUTION AND RESULTS

Micropiles and Rock Anchors were installed to support and tie down all buildings in this state-of-the art Wastewater Treatment Plant.

The results were fantastic. We installed over 30,000 lineal feet of Micropiles and Rock Anchors. We fulfilled the requirements of the Engineer of Record and general contractor.

CNC Foundations was required to test 10% of the Micropiles installed. During the testing, we met and exceeded the requirements for total movement allowed by the Engineer of Record. The worst movement during the testing was 2,000th of an inch (the requirement was for no more than ½” movement).

CNC Foundations more than exceeded the requirements of the EOR and the Owner.

Project Details

SECTOR
Municipal Utilities, Waste Water Treatment Plant

LOCATION
Bowling Green, Kentucky

APPLICATION(S)
Micropiles, Rock Anchors

Not sure what geotechnical solution can work for your job? We can help.

Related Case Studies

Micropiles

Missouri | Micropiles

On this job site, micropiles were used as the foundation solution to support the North, South, and center support columns for the new bridge.

View Case Study

Hollow Bar Micropiles

Scott Air Force Base, IL | Hollow Bar Micropiles

The project consisted of upgrading the existing building at an Air Force Base. The upgraded building will be an advanced communication center that will include black box encrypted services and other best of the best communication technologies.

View Case Study

Hollow Bar Micropiles

Missouri | Hollow Bar Micropiles

The design requirements for this deep foundation were 200 kips compression, 125 kips tension, and 25 kips shear. The soil borings revealed limestone at an approximate elevation of 135 feet. Above that was a mixture of gravelly sands, sands, sandy silts, and fill extending to the surface. The job site location was near the Missouri River.

View Case Study

Let’s Talk

  • By providing my phone number to CNC Foundations, I agree and acknowledge that CNC Foundations may send text messages to my wireless phone number for any purpose. Message and data rates may apply. We will only send one SMS as a reply to you, and you will be able to Opt-out by replying “STOP”. For more information on how your data will be handled please visit our Privacy Policy.