Warehouse
Installing Aggregate Piers
A proposed new structure consisted of a 400 x 600-foot warehouse with column supports on a 40 x 40-foot grid.
The new warehouse features an open bay structure with lightly loaded columns and a floor slab supporting heavily loaded storage racks.
Typical column loads being 56 kips, and rack loading on the floor slab in the range of 1,000 psf.
The existing soils consisted of fill material variable in depth across the project site, with a soft alluvial material underneath and extending to depths approximately 35 feet below ground surface.
Due to the variability in strength, depth of the fill materials, low strengths, and high compressibility of the alluvium material, significant differential settlement was expected in the column pads and slab.
CNC Foundations and Helitech CCD’s design-build aggregate pier system was selected as the best possible way to minimize differential and long-term settlement. On-site testing verified CNC Foundations and Helitech CCD’s design and confirmed minimum differential and long-term settlement.
SECTOR
Warehouse
LOCATION
Peoria, Illinois
APPLICATION(S)
Ground Improvement, Aggregate Piers / VSCs
St. Louis Ballpark Village Site – Installing Vibratory Stone Columns
Ballpark Village St. Louis, Clark Avenue, St. Louis, MO, USA
View Case Study
Vibratory Stone Column Uplift Anchor Installation at Western Carolina University
Cullowhee, NC
View Case Study
Pre-Drill VSCs and VCCs Fitness Center Chicago Suburb Oak Brook
OakBrook, IL
View Case Study
8259 Bunkum Rd
Caseyville, IL 62232
Atlanta | Chicago | Columbus | Des Moines | Indianapolis | Raleigh | St. Louis | Memphis | Newark
CNC Foundations builds value into your construction project. We employ a full-time engineering staff and support personnel who enable us to meet the most challenging demands of construction projects, including design and installation.