Your project has heavy loads, like a warehouse full of racking or a parking garage with big columns. The geotechnical report comes back and says the soil near the surface is too soft to support normal footings. If you build on it as is, the building could settle too much. Now the team has to decide: do you go with piles, or is there a simpler way?
Rigid inclusions are one option worth looking at. Rigid inclusions are columns of grout or concrete installed down through the soft soil until they reach firmer soil below. A layer of compacted gravel, called a load transfer platform, is placed on top of the columns. The building’s footings and floor slab then sit on that gravel layer.
The columns and the soil work as a team. The stiff columns pick up most of the weight and carry it down to the firmer ground, while the soil between them carries the rest. When the design supports it, this can let the building use regular footings and a regular slab instead of a full deep foundation system.
One key point: rigid inclusions are not attached to the footings above them. Piles are. That difference affects how the system is designed and when it makes sense to use it.
When do heavy loads rule out regular footings?
Regular footings (shallow foundations) stop working in two situations. The soil can’t hold the weight safely, or it will compress and let the building sink more than the design allows. On many commercial sites, the sinking (settlement) is the bigger problem, not the soil’s strength.
Heavy loads make both problems worse. This often comes up on:
- Warehouses and distribution centers with heavy racking and forklift traffic on the slab
- Multi-story buildings and parking garages with large column loads
- Industrial plants with heavy equipment or tanks
- Large sites where new fill is added to raise the grade, which loads the soil before the building is even built
The type of soil matters just as much as the load. Soft clay, loose or old fill, and organic soil can squeeze down under new weight. Soft clay can keep settling for months or even years. Uneven settlement, where one part of the building sinks more than another, is usually what causes the real damage: cracked slabs, doors that stick, and equipment that falls out of level.
When the report shows the footings would need to be too big, or the building would settle too much, the team has two basic choices:
- Improve the soil so regular footings can work. Rigid inclusions are in this group.
- Go around the soil with a deep foundation, such as piles, that carries the building down to firmer ground.
How do rigid inclusions keep a building from settling?
Rigid inclusions work by sending most of the building’s weight past the soft soil and down to firmer soil below. The soil between the columns still carries some of the load, so the columns and soil share the work.
The gravel layer on top (the load transfer platform) is what makes this sharing happen. When the building pushes down on the gravel, the stiff columns attract more of the weight than the soft soil around them. The gravel spreads that weight over to the column tops. Engineers set the thickness of this layer, and sometimes add a reinforcing grid, as part of the design.
Because the columns aren’t tied to the footings, the building above can usually be designed with normal footings sitting on the improved ground.
A few things to know about how the system fits on a job:

CNC Foundations installing rigid inclusions to improve ground conditions and support foundation performance for commercial and industrial projects.
- They work in very soft soil. Concrete or grout columns stand on their own. Gravel columns (aggregate piers) need the soil around them to hold them in place, so in very soft clay or organic soil, rigid inclusions may be a better match.
- They can limit spoils and vibration. Rigid inclusions are often installed with a tool that pushes soil out to the sides instead of hauling it up to the surface. That can mean less dirt to haul off, which helps on sites with contaminated soil. It also creates less vibration than driving piles. CNC’s page on displacement piles explains this installation method.
- Each layout is engineered for the site. Column size, spacing, depth, and the gravel layer are designed around the building loads, the soil, and how much settlement the structural engineer can accept.
You can learn more about CNC Foundations’ rigid inclusion capabilities on our service page.
When should you consider rigid inclusions instead of piles?
With deep foundations like driven piles, drilled shafts, or displacement piles, the building is tied directly to the piles through pile caps and grade beams. The piles carry the building’s weight down to firm ground. If the floor has heavy loads over soft soil, the slab may also need to be a structural slab supported by the piles.
Rigid inclusions take a different approach. They improve the ground so the building can stay on regular footings and a regular slab-on-grade.
Rigid inclusions may be worth a look when several of these are true:
- There’s a soft soil layer with firmer soil below it at a reachable depth
- The building mostly pushes straight down, without large uplift or sideways forces on the foundation
- The building could use regular footings and slab if settlement were under control
- Heavy floor loads would otherwise mean a pile-supported structural slab
- Nearby buildings, utilities, or occupied spaces make vibration a concern
- Hauling off soil is expensive or difficult, such as with contaminated soil
- The soil is too soft for gravel columns (aggregate piers) to work well
In these cases, keeping regular footings on improved ground can mean fewer pile caps, grade beams, and structural slabs in the design. Whether that saves money or time depends on the project, and it should be compared against a pile option rather than assumed.
When might another option be a better fit?
Rigid inclusions are one tool among several. Another approach may work better when:
- The building has big uplift or sideways forces. Since rigid inclusions aren’t attached to the footings, they can’t hold the building down or resist large sideways loads. A pile system tied to the structure is usually the better fit.
- There’s no firm soil within reach. If good soil is very deep, the columns lose much of their advantage.
- The loads and soils are moderate. If the soil can hold gravel columns in place and the settlement goals can be met, aggregate piers may do the job. Read more about aggregate piers for large-footprint buildings.
- The main problem is loose sand. If the concern is loose sand or liquefaction during an earthquake, methods that pack the sand tighter, like vibro compaction, may address it more directly.
- There’s a lot buried on site. Old foundations, boulders, or debris can get in the way of installing columns and need to be planned for.
Rigid inclusions are also not the only type of concrete column. Vibro concrete columns use different equipment and are built in a different way, and site conditions often decide which one fits. You can compare rigid inclusions and vibro concrete columns for more detail.
What does this look like on a real project?

CNC Foundations crews performing ground improvement work at Gaston Commerce Center in Gastonia, NC, where rigid inclusions and aggregate piers were used to address challenging soil conditions.
At the Airport Road Industrial Development in Elgin, Illinois, CNC installed rigid inclusions beneath a 25,000-square-foot facility built for fuel canopies and fuel storage tanks, which carried heavy industrial loads. Soil testing found highly variable, compressible soils, including organic fill with construction debris over clay sand with gravel and cobbles, which made it hard to control settlement. Traditional deep foundations were not cost-effective for this site, and the project also needed low vibration, little excavated soil, and a system that could be built in three phases. CNC installed more than 500 grout columns with a reverse flight displacement auger under a gravel load transfer platform, which allowed shallow foundations and finished on schedule, with post-installation testing confirming the structural and geotechnical requirements were met.
See how rigid inclusions supported fuel storage infrastructure at Airport Road.
What information do you need before choosing rigid inclusions?
The design is only as good as the information behind it. Before picking a system, the team should have:
- Soil borings or CPT tests that go through the soft soil and into the firmer layer below
- Groundwater levels
- Column loads, slab loads, and how much settlement the structural engineer can accept
- Any uplift or sideways forces on the foundation
- Site limits like equipment access, overhead clearance, nearby buildings, vibration limits, and where excavated soil can go
Bring in a specialty geotechnical contractor early. If they review this information during design, the ground improvement and the structural design can be planned together. Waiting until the drawings are done limits your options.
CNC Foundations has been a design-build geotechnical contractor since 1987. Our in-house engineers and field crews, along with our own equipment fleet, work on projects across the continental U.S. That lets us look at the design and the field work at the same time. If rigid inclusions aren’t the right fit, we’ll say so and help identify the ground improvement or deep foundation approach that is.
Evaluating foundation options for an upcoming project? The right approach starts with understanding the soil, the loads, and the site limits. Connect with your local Business Development Manager to talk through your site.
Turn on screen reader support
To enable screen reader support, press Ctrl+Alt+Z To learn about keyboard shortcuts, press Ctrl+slash