Ground Improvement—Installing Vibratory Stone Columns for Mixed-Use Building

PROJECT OVERVIEW

A commercial mixed-use building in downtown Washington, D.C. needed vibratory stone columns to stabilize its foundation. We provided 10- and 12-feet piers for the project. However, the project met a few setbacks when the contractors and subcontractors encountered a tieback wall and other similar obstacles.

REQUIREMENTS AND CHALLENGES

The 25-foot tieback wall prevented column installation at first because any alterations to it would create catastrophic results. A buried storage tank’s position also threatened to slow down the project. 

SOLUTION AND RESULTS

We worked with the contractors and subcontractors to navigate the tieback wall issue so the columns didn’t harm it. When we discovered the storage tank, we worked elsewhere on the site and allowed another team to dig it out so no time was lost after the tank was discovered and dug out of the site. 

Our team was able to complete the stone column installation smoothly and stayed within the project’s budget and timeline. The general contractor said he’d recommend CNC Foundations, and we’re in the process of working with him again.

Project Details

SECTOR
Commercial—Office, Retail, Food

LOCATION
Washington, D.C.

SERVICE
Washington, D.C.

APPLICATION(S)
Aggregate Piers / Vibratory Stone Columns

SOLUTION
Bearing Capacity / Settlement Control

Not sure what geotechnical solution can work for your job? We can help.

Related Case Studies

Ground Improvement

St. Louis, MO | Aggregate Piers / VSCs

CNC Foundations completed a project in St. Louis as an addition to Ballpark Village, an entertainment district adjacent to Busch Stadium.

View Case Study

Ground Improvement

Columbus, OH | Vibratory Stone & Concrete Columns

Three new buildings required a 7000 psf bearing pressure. CNC Foundations was selected to install an Aggregate Pier/VSC Ground Improvement.

View Case Study

Ground Improvement

Iowa | Aggregate Piers / VSCs

A new gymnasium addition was constructed on a high school campus. As a result of the soil conditions, ground improvement was required.

View Case Study

Let’s Talk

  • By providing my phone number to CNC Foundations, I agree and acknowledge that CNC Foundations may send text messages to my wireless phone number for any purpose. Message and data rates may apply. We will only send one SMS as a reply to you, and you will be able to Opt-out by replying “STOP”. For more information on how your data will be handled please visit our Privacy Policy.