A new gymnasium addition was being constructed on the campus of a high school. As the result of the soft, compressible soils conditions ground improvement was required for support of the gymnasium foundation walls.
As the result of low density soils falling within the foot print of the proposed structure, this provided concerns and the Engineer of Record specified the ground to be improved along the exterior strip footings.
CNC Foundations installed new construction helical piles within 16 feet of the adjacent structure and monitored capacities by recording installation torque values during the pile installations. We conducted a full-scale load test to field verify the vibro stone column (VSC) loads and deflection. We installed VSC’s along the exterior wall footings at various depths depending on in-situ soil strengths.
We completed the ground improvements in a couple of days. The tests performed extremely well and deflections were approximately 50% of the maximum deflection tolerances.
SECTOR
High School Gymnasium
LOCATION
Onawa, IA
APPLICATION(S)
Vibratory Stone Columns (VSCs) / Aggregate Piers
Helical Piles
St. Louis Ballpark Village Site – Installing Vibratory Stone Columns
Ballpark Village St. Louis, Clark Avenue, St. Louis, MO, USA
View Case Study
Vibratory Stone Column Uplift Anchor Installation at Western Carolina University
Cullowhee, NC
View Case Study
Pre-Drill VSCs and VCCs Fitness Center Chicago Suburb Oak Brook
OakBrook, IL
View Case Study
8259 Bunkum Rd
Caseyville, IL 62232
Atlanta | Chicago | Columbus | Des Moines | Indianapolis | Raleigh | St. Louis | Memphis | Newark
CNC Foundations builds value into your construction project. We employ a full-time engineering staff and support personnel who enable us to meet the most challenging demands of construction projects, including design and installation.